Tgex7.5 Thermostatic Expansion Valves for Heat Pump

US$53.15
10-49 Pieces
US$50.43
50+ Pieces
Port:
Shanghai, China
Production Capacity:
100000 Set/Sets Per Month
Payment Terms:
L/C, T/T

Last Login Date:

Dec 02, 2024

Business Type:

Manufacturer/Factory

Main Products:

Cold Room, Compressor, Condenser, PU Panel, Refrigeration Equipment, Blast Freezer, Air Cooler

Find Similar Products

Product Description

Company Info

Basic Info.

Model NO.
TGEX7.5
Temperature
Type
Direct-acting
Material
Connection Form
Outside Thread
Actuator
Seal Surface
Wedge Gate Valve
Thread Position of Valve Rod
Outside Gate Valve
Standard
GB
Application
Industrial Usage
MOQ
20PCS
Nominal Refrigerating
1.76 Kw
Outlet
10*2mm SAE
Inlet
3/8*1/2 Inch
Trademark
Jiate
Transport Package
Wooden Case
Specification
1 kg
Origin
Guangdong

Product Description

Product Description

The features of  thermostatic expansion valve TGEX7.5:

ItemTGEX7.5
Capacity27Kw
Connect ODF5/8''*7/8''(16*22mm)
TypeStraight
Connect typeWelding

 
Our Cases

 

FAQ

1. Who are we?
We are based in Hubei, China, starting from 2003, specializing in refrigeration industry for 20 years, and staff in our company is more than 100, meanwhile, our footprints are all over China, playing more and more important role in international market.

2.What can you buy from us?
 Refrigeration Compressors, Condensing Units, Refrigeration Equipment, thermal insulation Sandwich Panels and other Parts, also, we provide turn-key solutions and products according to your needs.

3. Why choose us?
We can list the advantages and disadvantages of different solutions (Construction Cost, Running Cost, Maintenance Cost and etc ), which may help you make a decision.

4. How can we guarantee quality?
All parts have gone through strict test before assembly in batch, and the finished goods will go through quality test before packing and shipping, also we provide after-services both online and local technical instruction if necessary.

5. What is your standard delivery time and shipping port?
 It usually takes 10~20 working days for standard parts. And for customized products, it may take 20~30 working days. Departing from ShangHai, Tianjin and other Ports.

Send your message to this supplier
Mr. Zhou

Post a Sourcing Request Now

People who liked this also liked