Media: | Refrigerant |
---|---|
Temperature: | Low Temperature |
Type: | Direct-acting |
Material: | Brass |
Connection Form: | Thread |
Pressure: | High Pressure |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
1.Thermostatic expansion valves regulate the injectionof refrigerant liquid into evaporators.Injection is controlled by the evaporators superheat.
2.Thermostatic expansion valves can be used for refrigeration cabinet, ice machine, dehumidify unit, and refrigeration and air conditioning requirement in a wide range of temperature.
Type
|
TD1 series
|
T2 series
|
TUA series
|
TUB series
|
|
• Designed for small applications
• Wide temperature range
|
• Standard valve for multible applications
|
• Compact design and light weight
• With steel / copper bi-metal connections for fast soldering
|
|
Orifice type
|
Fixed
|
Exchangeable
|
Exchangeable
|
Fixed
|
Superheat
|
Fixed / Adjustable
|
Adjustable
|
Adjustable
|
Adjustable
|
1. Who are we?
We are based in Hubei, China, starting from 2003, specializing in refrigeration industry for 20 years, and staff in our company is more than 100, meanwhile, our footprints are all over China, playing more and more important role in international market.
2.What can you buy from us?
Refrigeration Compressors, Condensing Units, Refrigeration Equipment, thermal insulation Sandwich Panels and other Parts, also, we provide turn-key solutions and products according to your needs.
3. Why choose us?
We can list the advantages and disadvantages of different solutions (Construction Cost, Running Cost, Maintenance Cost and etc ), which may help you make a decision.
4. How can we guarantee quality?
All parts have gone through strict test before assembly in batch, and the finished goods will go through quality test before packing and shipping, also we provide after-services both online and local technical instruction if necessary.
5. What is your standard delivery time and shipping port?
It usually takes 10~20 working days for standard parts. And for customized products, it may take 20~30 working days. Departing from ShangHai, Tianjin and other Ports.
Suppliers with verified business licenses